Search This Blog

Friday, November 16, 2012

HMS Astute: nuclear submarine beset by design problems and construction failures

HMS Astute |HMS Astute, the first of seven new submarines to be built at a cost of £9.75bn, is reportedly too slow, is subject to leaking and is rusty in parts.

The boat, lauded as the most sophisticated Navy submarine, cannot race to emergencies or away from an attack – considered an essential requirement – because it is unable to reach its intended top speed.

It also cannot maintain the more than 30 knot speed with the Navy new aircraft carriers, which the submarines protect, because of what sources described to The Guardian as a "V8 engine with a Morris Minor gearbox".

Read more

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Fair Use Notice

This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner.

The material is being made available in an effort to advance understanding arms trade activities, for non-profit research and educational purposes only.

I believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law.

If you wish to use this copyrighted material for purposes of your own that go beyond 'fair use,' you must obtain permission from the copyright owner.

This is a completely non-commercial site for private personal use. No fee is charged, and no money is made off of the operation of this site.