Just over six months after the official opening of Austal’s new Module Manufacturing Facility (MMF) in November 2009, Austal USA hosted a keel-laying ceremony at its shipyard in Mobile, Alabama on July 22, to signify the erection of the first modules on the U.S. Department of Defense’s next generation multi-use platform, the Joint High Speed Vessel (JHSV). This is part of a 10-ship program potentially worth over $1.6b.
Keel Laying is the formal recognition of the start of the ship’s module erection process. In earlier times it was the “laying down” of the central or main timber making up the backbone of a vessel.
Today, fabrication of the ship modules begins months before the units are actually joined. However, the keel laying symbolically recognizes the joining of modular components and the ceremonial beginning of a ship.
Read more
No comments:
Post a Comment
Note: only a member of this blog may post a comment.