
Due to harsh weather conditions in St. Petersburg, the naval diesel-electric submarine was loaded on to the Dutch heavy lift ship at Kaliningrad’s Yantar shipyard instead of Admiralty Verfi.
The loading was supported by two tug boats and a canoe. The Dutch ship is now travelling to the Baltic Sea and then to Vietnam. It is scheduled to dock at Cam Ranh Port in one and a half months.
Read more
No comments:
Post a Comment
Note: only a member of this blog may post a comment.