.jpg)
This represents a significant proportion of the vessel’s current upgrade package and is an integral part of the 15-month overhaul program underway at Babcock’s Devonport Royal Dockyard.
The new MBR replaces the ship’s existing 15-year-old sewage treatment system and will be capable of processing both waste water and sewage (black and grey water, galley, laundry, sink and shower waste).
Read more
No comments:
Post a Comment
Note: only a member of this blog may post a comment.