Search This Blog

Wednesday, April 09, 2014

U.S. Deputy Program Manager Outlines F-35 Fixes

F-35B Lightning IIF-35 manufacturer Lockheed Martin will retrofit early production lots of F-35Bs delivered to the U.S. Marine Corps with modified bulkheads to address cracking issues that came to light during durability testing of ground articles last fall.

It will build redesigned bulkheads into the fighter beginning with low-rate production (LRIP) Lot 9, said Rear Adm. Randy Mahr, deputy program manager with the Pentagon’s F-35 joint program office (JPO).

“The repair for that bulkhead for the [F-35Bs] that are out there in the fleet is known, it’s understood, and we’ll be retrofitting LRIP Lots 1 through 7,” Mahr told the Navy League Sea-Air-Space conference on April 7.

Read more

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Fair Use Notice

This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner.

The material is being made available in an effort to advance understanding arms trade activities, for non-profit research and educational purposes only.

I believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law.

If you wish to use this copyrighted material for purposes of your own that go beyond 'fair use,' you must obtain permission from the copyright owner.

This is a completely non-commercial site for private personal use. No fee is charged, and no money is made off of the operation of this site.