Search This Blog

Friday, February 18, 2011

Lockheed Martin Receives $726.6 Million Contract Modification For F-22 Raptor Sustainment

F-22 RaptorLockheed Martin Corp. has received a $726.6 million contract modification from the U.S. Air Force for sustainment of the F-22 Raptor fleet.

This modification is for the 2011 Follow-On Agile Sustainment for the Raptor (FASTeR) sustainment contract, which was awarded initially in 2008, with an option for 2009 that was exercised. A follow-on modification was issued for 2010.

FASTeR is a Performance-Based Logistics contract providing weapon systems sustainment of the F-22 fleet at all operational bases for the 2011 calendar year, including training systems, customer support, integrated support planning, supply chain management, aircraft modifications and heavy maintenance, sustained engineering, support products and systems engineering.

Read more

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Fair Use Notice

This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner.

The material is being made available in an effort to advance understanding arms trade activities, for non-profit research and educational purposes only.

I believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law.

If you wish to use this copyrighted material for purposes of your own that go beyond 'fair use,' you must obtain permission from the copyright owner.

This is a completely non-commercial site for private personal use. No fee is charged, and no money is made off of the operation of this site.