The contract for supply of three Airborne Warning and Control System (AWACS) aircraft was signed with M/s Elta, Israel on March 05, 2004. The first and second AWACS aircraft were delivered to the Indian Air Force on May 25, 2009 and March 25, 2010 respectively as per the revised delivery schedule.
The delivery of the third aircraft is planned for December 2010. Additional AWACS aircraft are planned to be procured in the 12th, 13th and 14th Plans.
Read more
No comments:
Post a Comment
Note: only a member of this blog may post a comment.