Search This Blog

Thursday, September 11, 2008

Boeing Completes Mission System Flight Testing for US AWACS Block 40/45 Upgrade

The Boeing Company has completed mission system flight testing for Block 40/45, the largest upgrade in the history of the U.S. E-3 Airborne Warning and Control System (AWACS) fleet.

During a 15-month period from April 2007 to July 2008, Boeing and the Air Force’s Joint Test Force flew missions aboard Test System 3, an AWACS test aircraft, to complete the System Design and Development program.

Under the Block 40/45 program, the aircraft’s legacy mainframe computer has been replaced with an open system architecture using network servers in a user-friendly operating environment. The vastly improved computing power helps automate what is currently a manually intensive workload for the AWACS operators.

Read more

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Fair Use Notice

This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner.

The material is being made available in an effort to advance understanding arms trade activities, for non-profit research and educational purposes only.

I believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law.

If you wish to use this copyrighted material for purposes of your own that go beyond 'fair use,' you must obtain permission from the copyright owner.

This is a completely non-commercial site for private personal use. No fee is charged, and no money is made off of the operation of this site.