Search This Blog

Wednesday, June 25, 2008

US Navy asks Boeing to accelerate P-8A deliveries

The US Navy has asked Boeing to make good on a four-year-old promise to accelerate deliveries of P-8A Poseidon long-range maritime patrol and reconnaissance aircraft, following last December's grounding of around a quarter of its Lockheed P-3C Orions.

"We're working with the navy right now on a capacity analysis to understand what the possible rates out of the factory are," says Boeing Integrated Defense Systems P-8A programme manager Bob Feldmann. "There's a gap in capability that needs to be filled."

Boeing Commercial Airplanes vice-president P-8A Mo Yahyavi says the manufacturer believes it can build "18-24 airplanes per year" for the USN and international customers. The navy has ordered 108 aircraft for service-entry from 2013, to be delivered at a rate of 13 a year.

Read more

No comments:

Post a Comment

Note: only a member of this blog may post a comment.

Fair Use Notice

This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner.

The material is being made available in an effort to advance understanding arms trade activities, for non-profit research and educational purposes only.

I believe this constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law.

If you wish to use this copyrighted material for purposes of your own that go beyond 'fair use,' you must obtain permission from the copyright owner.

This is a completely non-commercial site for private personal use. No fee is charged, and no money is made off of the operation of this site.