Boeing delivered the 12th production P-8A Poseidon on schedule on Oct. 25, enhancing the long-range maritime patrol capabilities of the U.S. Navy.The P-8A departed Boeing Field in Seattle for Naval Air Station Jacksonville, Fla., where it joined the other Poseidon aircraft being used to train Navy crews.
The aircraft is the sixth from the second low-rate initial production contract lot awarded in November 2011.
Read more
No comments:
Post a Comment
Note: only a member of this blog may post a comment.