
A spokesperson from the Brazilian Navy told Shephard that the reactor design had been completed with assistance from France but that the reactor itself would be built in Brazil at a later date.
The navy had two separate designs of the SN-Br on display at the stand. A model from the navy’s technology centre in Sao Paulo showed a submarine divided into seven blocks with the PWR reactor positioned amidships eight torpedoes situated at the front of the boat.
Read more
No comments:
Post a Comment
Note: only a member of this blog may post a comment.