
The contractor will accomplish USS Miami (SSN 755) fire restoration efforts which include assessment and analysis, planning, material procurement, fabrication and initial installation as required to return this mission ready submarine to the fleet.
This work will be done in coordination with the on-going Engineered Overhaul being executed by Portsmouth Naval Shipyard, and was assigned to the private sector based on workload constraints at the public shipyards.
Read more
No comments:
Post a Comment
Note: only a member of this blog may post a comment.