At Damen Schelde Naval Shipbuilding in Vlissingen, on February 2, the second Multi-Mission Frigate under construction for the Royal Moroccan Navy, was rolled out of the assembly hall. The 98 metre long ship has been constructed entirely on land at the DSNS yard at Vlissingen-East and is now ready, on schedule, to be completed at the Vlissingen-City shipyard.
Heavy Lifting and Transport company Mammoet Europe B.V., moved the 1700 ton vessel from the assembly hall to the pontoon after which the ship was launched.
Read more
No comments:
Post a Comment
Note: only a member of this blog may post a comment.