Two months after it was floated out at a ceremony at Cochin Shipyard India’s first indigenous aircraft carrier INS Vikrant has now been taken to the bigger, repair dock of the yard for the second phase of construction.Launched at 17,500 tonnes with the ski-jump in place, the carrier will displace 40,000 tonnes once it is fully built and fitted out. Structural work on the fleet’s air defence platform — including entire hull work, angle deck and island structure, all using about 4,000 tonnes of steel — is slated to be over by May next, when it will be undocked for integration of the crucial aviation complex, complete with hangars, hydraulics, command-control and the like.
Basin trials of the carrier will happen in the last phase, set to commence in 2017.
Read more
No comments:
Post a Comment
Note: only a member of this blog may post a comment.